Home > Knowledge > Content

Product Categories

CONTACT US
ADD:First Floor, Zhainei Factory Area, Zhongyacheng Industrial Zone, North Jinting Road, Jimei District, Xiamen City, Fujian Province, P.R. China 361000
TEL:+86-592-6681751
M.B:+8618605957308
FAX: +86-592-6281756
Email:sales@xmsrisen.com
SC standard cylinder installation and use
Feb 24, 2017

1, the work of the load changes, should use the output force of the cylinder, in high temperature conditions, should use the appropriate high temperature cylinder.

2, before the cylinder tube, you must remove the debris inside the tube to prevent debris into the cylinder.

3, the cylinder media should be used after 40 μ m filter filter before use.

4, in low temperature environment, should take anti-frost measures to prevent the system of water freeze.

5, the cylinder should be used before the test run, before the buffer will be transferred to the minimum, and gradually enlarged, so as to avoid excessive impact and loss of the cylinder.

4, the cylinder in the course of work should be avoided as far as possible lateral load to maintain the normal working life of the cylinder.

5, the cylinder removed for a long time do not use, pay attention to the surface rust, into the exhaust port should be added dust plug.

Quick Navigation
  • About Us
  • Product
  • News
  • Knowledge
  • Contact Us
  • Feedback
  • Newsletter
    Enter in your email address to receive deals and coupons.
    +8618605957308
    +86-592-6681751 sales@xmsrisen.com